Standard Lithium files Franklin lithium project PEA technical report in Texas
Standard Lithium reports filing the preliminary economic assessment technical report for Franklin, its joint project with Equinor, on SEDAR+. The model envisages capacity of up to 70,000 tonnes of battery-quality lithium carbonate per year, with potential initial production in the early 2030s. It recommends advancing to a pre-feasibility study and continuing DLE tests on project brine. This filing documents results announced on September 8; Franklin is not yet producing lithium.
- Source date
- 20 Oct 2026 · P2
