UKRAINE · DIRECT LITHIUM EXTRACTIONGeology. Technology. Development.
RESEARCH AND DEVELOPMENT

Building Ukraine’s lithium industry

We are turning geological knowledge of Ukraine’s lithium-bearing waters into a defined programme of area selection, well investigation and process testing.

Results from 2025–2026 and the 2026–2028 programme

PDF in Ukrainian and English. Access after email confirmation.

Aerial view of the Desna River and its floodplain, Ukraine
Desna River, Ukraine · © Papa han · CC BY-SA 4.0
01 / RESULTS

What the 2025–2026 work has established

Archives, basin models, laboratory records and well histories now form a connected research base. It identifies reservoirs to investigate, records to recover and the fieldwork required for the next stage.

01

A geological basis for selection

Research areas have been mapped and reservoir architecture, stratigraphy and basin thermal history assessed together. The work defines target intervals and the investigations needed to verify them.

02

From an analytical record to a reservoir interval

The team reviewed archival sources, well passports, test records and water analyses. Reconstructed links between samples and intervals provide the basis for targeted sampling and engineering preparation.

03

A laboratory research programme

Work covered water and core analysis, sample preparation, lithium determination by ICP-MS and laboratory quality control. The analytical dataset and sample registers support geological assessment and further sampling design.

04

Process development for the actual brine

Technical dialogue with international developers has defined sampling and testing requirements. In parallel, we are developing our own process approach for highly saline waters, investigating lithium and associated components.

02 / CASES

Cases shaping the next investigations

Each case connects geological context and source verification with a defined task for the next stage.

A01

A reconstructed hydrochemical profile

A historical lithium record has been correlated with a water analysis and a test record for the same interval. The next work will resolve the lithium sample’s identity and obtain a contemporary interval-specific sample.

A03

A deep Devonian target

The compilation, well passport and geological records establish the interval and stratigraphic framework for further sampling. Contemporary analysis of a representative sample will test the historical lithium observation.

A02

Further reservoir verification

The audit reconstructed the testing history and identified a water-bearing target. Sample provenance and individual inflow contributions require further resolution. The area remains in the third verification tier.

A04

Sample and interval traceability

The review identified gaps linking the analytical record, original sample and reservoir. The case remains in the third verification tier, with a defined task to reconstruct that connection.

Historical observations and contemporary laboratory results are recorded separately. Verification tiers define the sequence of research work.

03 / NEXT STAGE

The 2026–2028 programme

We are continuing exploration and preparing comparable area dossiers. The next decisions will cover target selection, acquisition of rights, well operations and a recovery pilot.

  1. 012026–2028

    Expand the evidence base

    Digitise water records, refine basin models and map additional targets. Hydrochemical profiles will guide the search for comparable reservoirs.

  2. 022026–2027

    Select the priority area

    Prepare comparable geological and engineering dossiers and run an internal technical selection. Compare evidence, well access, water chemistry and development requirements.

  3. 032027–2028

    Acquire the special subsoil-use permit

    Acquire subsoil-use rights for the selected target and agree well access with the operator. Establish the legal route for component recovery and brine return.

  4. 042026–2028

    Laboratory and process development

    Develop Ukrainian analytical capacity towards accreditation. Verify representative samples, compare recovery routes and conduct repeated-cycle process tests.

  5. 052027–2028

    A pilot with well interventions

    Undertake well interventions, isolate and test the target reservoir. Pilot component recovery with controlled brine return and measured flow, recovery and operating costs.

  6. 062028

    A demonstration project

    Use pilot results to validate sustained process operation and define the parameters for industrial scale-up.

Workstreams advance in parallel. Progression to field pilots and demonstration will depend on verified results, access rights and technical readiness.

KNOWLEDGE · PEOPLE · TECHNOLOGY

Research capability in Ukraine

We are bringing together geological evidence, well-engineering expertise and the development of laboratory and pilot facilities. We plan to involve students and early-career geologists in archival, analytical and laboratory work. This capability will provide a strong platform for a new lithium industry.

WHITE PAPER · OCTOBER 2026

Lithium-bearing waters of Ukraine

The geological basis, documented cases, process-development programme and path to 2028 in one document.

Ukrainian and English · PDF

Checking your access…