Rio Tinto
From asset acquisition to DLE scale-up.
How global producers, technology integrators and service companies advance lithium extraction from brines—from research to industrial projects.
Explore companiesAnnounced plansA new industry is taking shape around lithium from brines. Leading mining and energy companies are committing capital, technology and subsurface expertise, while service leaders provide the engineering foundation for scale. Their investment looks toward the next phase of the energy transition: batteries, energy storage and new critical-mineral supply chains. DLE offers the potential for a smaller environmental footprint by reducing reliance on evaporation ponds and enabling brine reinjection. Realising that potential depends on the geology and engineering of each project.
From asset acquisition to DLE scale-up.

Proprietary technology at industrial scale.
An established producer’s transition to DLE.
A technology transition at Salar de Atacama.
Integration from brine to finished product.
Wells and reservoir data supporting DLE.

Pumping systems and digital optimisation.

Pressure control in geothermal wells.

From oil and gas expertise to battery lithium.
A Smackover resource base for a new lithium business.
Partnership backed by subsurface expertise.

Geothermal brines through TerraLithium.
Asset and service locations. Markers indicate regions, not exact well or plant coordinates.
Stage belongs to a specific project or facility. Permits and investment decisions are considered separately.
| Company / role | Project / region | Brine / approach | Confirmed stage |
|---|---|---|---|
| Rio TintoOwner and operator | Rincon · expansionSalta, Argentina | Salar brineDirect extraction from salar brine | ConstructionPrimary source |
| Rio TintoOwner and operator | Rincon 3000 · starterSalta, Argentina | Salar brineDirect extraction from salar brine | DemonstrationPrimary source |
| ErametOwner and technology developer | Centenario-RatonesSalta, Argentina | Salar brineProprietary DLE process | Ramp-upPrimary source |
| AlbemarleProducer and project developer | Salar de Atacama · DLE pilotAtacama, Chile | Salar brineDLE; detailed flowsheet requires verification | PilotPrimary source |
| SQM / Novandino LitioProducer / operating entity | Salar FuturoAtacama, Chile | Salar brineSalar Futuro; DLE scope under review | Stage not confirmedPrimary source |
| SLBTechnology integrator | Clayton ValleyNevada, United States | Continental brineFrom subsurface brine to lithium product | DemonstrationPrimary source |
| HalliburtonService contractor | Smackover · Arkansas appraisalArkansas, United States | Formation brineReservoir appraisal, sampling and well design | ResearchPrimary source |
| HalliburtonService contractor | GeoFrame · East TexasEast Texas, United States | Formation brineReservoir appraisal, sampling and well design | Stage not confirmedPrimary source |
| Baker HughesEquipment and services supplier | ESP + LeucipaEurope; site not disclosed | Geothermal brineESP and Leucipa system | Stage not confirmedPrimary source |
| WeatherfordService contractor | Lithium de France · SchwabwillerAlsace, France | Geothermal brineManaged pressure drilling (MPD) | ResearchPrimary source |
| ExxonMobilEnergy company / DLE development | Mobil Lithium · Texas pilot / Arkansas brineTexas / southern Arkansas, USA | Formation brineDLE from formation brines | PilotPrimary source |
| ChevronEnergy company / DLE development | Smackover · leasehold developmentTexas / Arkansas, USA | Formation brineDLE from formation brines | ResearchPrimary source |
| EquinorEnergy company / DLE development | Standard Lithium partnership · SmackoverSouthwest Arkansas / East Texas, USA | Formation brineDLE from formation brines | Stage not confirmedPrimary source |
| OccidentalEnergy company / DLE development | TerraLithium / BHE · Imperial ValleyCalifornia, USA | Geothermal brineDLE from geothermal brines | DemonstrationPrimary source |
Future milestones matter too. These are announced intentions and schedules, with their primary sources.
Expansion: first product expected in 2028. Rio Tinto plan, not a confirmed start-up.
Primary sourceAn RIGI application for expansion is planned; this is not a final investment decision.
Primary sourceGeoFrame: the 2025 announcement scheduled work for late 2025. Actual commencement requires confirmation.
Primary sourceSalar Futuro documentation review. The exact DLE route needs further verification.
Primary sourceBecome a leading North American lithium carbonate supplier in the first half of the 2030s—the ambition stated in its 2026 report.
Primary sourceEvaluate and develop the acquired acreage toward a commercial DLE business. The cited announcement sets no start-up date.
Primary sourceMature the joint assets with Standard Lithium toward potential investment decisions and industrial scale-up.
Primary sourceDemonstration operations are expected to continue through 2027, informing scale-up assessments and a future commercialisation decision.
Primary sourceExisting feed articles linked to companies. A news item does not automatically change a project’s stage.
Big Four is an editorial selection of four companies in each group. Information checked against the listed primary sources on 13 October 2026. Undisclosed details are identified separately. Company plans do not establish future outcomes.