UKRAINE / LITHIUM / LEGAL FRAMEWORK

Lithium in Ukraine: from national strategy to a framework for DLE

Ukraine has identified lithium as a material for the energy transition. Turning subsurface brine potential into a new industry requires predictable resource rights, a clear path from research to production, and accountability throughout the water cycle. DLE Field System is developing proposals that bring these conditions together.

Explore national priorities, existing rules and proposed improvements for direct lithium extraction. Official decisions and plans are presented separately from our team’s proposals.

Reviewed

Lithium is already part of Ukraine’s industrial agenda

National strategy · 27 May 2026

«Lithium is a critically important material for the production of lithium-ion batteries used in electric vehicles, portable electronics and energy storage systems.»

Strategy approved by Cabinet of Ministers Order No. 569-р of 27 May 2026, Lithium section.Official text
Unofficial translation · Ukrainian original

Літій є критично важливим матеріалом для виробництва літій-іонних акумуляторів, які використовуються в електромобілях, портативній електроніці та установках зберігання енергії.

The national strategy connects lithium with transport, energy storage and technology industries. This provides important strategic context for subsurface brine projects. Developing the resource requires project-specific alignment of rights, research and the technological cycle.

Energy and transport

Lithium supports batteries and energy storage systems.

Value creation in Ukraine

Lithium chemicals, battery components and links to European supply chains.

Research and piloting

The operational plan provides for laboratory and pilot infrastructure for critical raw materials.

What is planned for research

2026–2027Planned measure

Pilot science parks

The plan calls for work towards science parks in the critical raw materials sector. Its target is three parks with technology and innovation support centres.

S1
2027Planned measure

Testing laboratories and pilot zones

Planned measures include an accredited laboratory network and the identification of potential pilot zone locations for technologies that contribute to net-zero emissions.

S1
2026–2028Planned measure

Recovering components from waste

The plan envisages a state key laboratory and pilot processes for recovering critical components from waste. Applying this measure to a particular formation-brine project requires a separate justification.

S1

The strategy sets a direction; it does not replace the special permit or other decisions required for an individual project.

A legal foundation exists. The full cycle needs alignment

Ukrainian rules already address industrial groundwater and the recovery of useful components. DLE needs a coherent pathway connecting resource rights, research, lithium extraction, water management and impact monitoring.

Resource and components

What is already established

The instruction on industrial groundwater explicitly covers recoverable components, including lithium. It provides a basis for classifying the reserves and resources of these deposits.

S3
What we propose to align

Connect water composition testing, component reserve assessment and the granting of rights into a consistent pathway for each DLE project.

Spatial rights

What is already established

The Subsoil Code governs the use and spatial boundaries of a subsoil area and the relationship between permits. Groundwater documentation also accounts for abstraction facilities.

S2S4
What we propose to align

Align the DLE area’s horizontal and depth boundaries, abstraction and reinjection intervals, boundary revisions, and their treatment in auction and permit documents.

Water and reinjection

What is already established

Article 48 of the Water Code excludes the use of groundwater to extract useful components from special water use. Other water operations are assessed separately. Article 75 addresses the return of associated formation water from oil and gas fields; its application to brine after DLE requires a separate legal assessment.

S5
What we propose to align

Define the receiving interval, technological project, water composition and volume requirements, monitoring, and water management arrangements if reinjection stops.

Infrastructure and other operators

What is already established

Subsoil use rights do not replace rights to land, wells or equipment. Access to infrastructure requires its own legal arrangements.

S2
What we propose to align

Establish compatible operating conditions for the DLE operator and existing subsoil user, contractual infrastructure access, data exchange and clear responsibilities.

A laboratory sample test, a field pilot involving abstraction and reinjection, and industrial operations are different activities. Environmental impact assessment and other requirements depend on the nature and scale of the specific works. S10

Developing proposals for the full DLE cycle

DLE Field System is working to improve the legal conditions for direct lithium extraction from subsurface brines. We are developing proposals with Ukraine’s professional community to align resource rights, the technological cycle and safety requirements. Our aim is a predictable foundation for research, investment and responsible industrial development.

Proposals prepared · Professional review

From research to production

Align geological exploration, trial production, component assessment and the transition to commercial extraction.

Spatially defined rights

Define the boundaries, area and depths of a technically justified part of the formation, abstraction and reinjection intervals, and a process for revising boundaries.

Access and compatible operations

Establish clear auction conditions, respect existing rights and provide contractual arrangements with infrastructure owners.

Reinjection of treated water

Align rights to the receiving interval, the technological project and reinjection requirements. Treated water must be assessed for compatibility with the specific formation.

Monitoring and accountability

Define how abstraction, extracted components and reinjection are measured, how water and wells are monitored, and when operations must stop or water management must change.

Using existing infrastructure

Define conditions for reusing oil and gas wells following inspection, integrity assessment and confirmation of technical suitability.

Transparent resource payments

Align the measurement of water, extracted components and saleable product with the applicable fiscal rules.

Areas of work: the Subsoil Code, Water Code, related procedures and secondary legislation; the Tax Code is being considered separately.

Our proposed framework

The DLE legal iceberg

Resource rights are the starting point. The full cycle also needs rules for water reinjection, safety and accountability.

  1. 01

    Special permit

    Who may use which resource, and for which operations.

  2. 02

    Spatial boundaries

    Horizontal boundaries, area, depth intervals, and abstraction and reinjection zones.

  3. 03

    Water and lithium extraction

    Lawful water supply, rights to extract dissolved components, and accounting for reagents and residues.

  4. 04

    Operator coexistence

    Compatible operating conditions, data exchange and rights to use wells.

  5. 05

    Reinjection authorisation

    Rights to the receiving interval and a technological project before operations begin.

  6. 06

    Reinjection safety

    Water composition, formation suitability, well integrity, pressure, volumes and protection of fresh groundwater.

  7. 07

    Monitoring and accountability

    Monitoring, suspension when unsafe, and lawful water management if reinjection stops.

Our proposed framework. Segment sizes are illustrative.

From priority to practical conditions

National agenda

  1. 27 May 2026

    Strategy to 2056

    Adopted

    The Government endorsed the Strategy and approved the operational plan for 2026–2028.

    S1
  2. 2026–2028

    Research, laboratories and pilot technologies

    Planned

    The national plan sets out measures to develop research infrastructure. Progress must be established through implementation reports.

    S1
  3. 1 March 2027

    First annual report

    Reporting deadline

    The first annual report on implementation of the Strategy is due to the Government by 1 March 2027 and is to be published by the Ministry of Economy.

    S1
  4. 16 October 2026

    Subsoil use bills

    Awaiting consideration

    As of 16 October 2026, Bill 15454 and alternative Bill 15454-1 await consideration. Committee opinions are a stage in the parliamentary process.

    S8S9

DLE Field System’s work

  1. Proposals prepared

    Prepared

    Proposals have been developed to align resource rights, the technological cycle and DLE operators’ responsibilities.

  2. Professional review

    In progress

    We are working with Ukraine’s professional community on spatial rights, water reinjection, operator compatibility and oversight of the full cycle.

  3. An agreed public proposal

    Next step

    The next step is to agree a public version of the proposals and present it through the relevant professional and policy development processes.

  4. Conditions for implementation

    Subject to required decisions

    Progression to field and commercial operations depends on the necessary decisions, studies, resource rights and project approvals.

DLE FIELD SYSTEM