UKRAINE / LITHIUM / LEGAL FRAMEWORK
Lithium in Ukraine: from national strategy to a framework for DLE
Ukraine has identified lithium as a material for the energy transition. Turning subsurface brine potential into a new industry requires predictable resource rights, a clear path from research to production, and accountability throughout the water cycle. DLE Field System is developing proposals that bring these conditions together.

Explore national priorities, existing rules and proposed improvements for direct lithium extraction. Official decisions and plans are presented separately from our team’s proposals.
Reviewed
Lithium is already part of Ukraine’s industrial agenda
«Lithium is a critically important material for the production of lithium-ion batteries used in electric vehicles, portable electronics and energy storage systems.»
Unofficial translation · Ukrainian original
Літій є критично важливим матеріалом для виробництва літій-іонних акумуляторів, які використовуються в електромобілях, портативній електроніці та установках зберігання енергії.
The national strategy connects lithium with transport, energy storage and technology industries. This provides important strategic context for subsurface brine projects. Developing the resource requires project-specific alignment of rights, research and the technological cycle.
Energy and transport
Lithium supports batteries and energy storage systems.
Value creation in Ukraine
Lithium chemicals, battery components and links to European supply chains.
Research and piloting
The operational plan provides for laboratory and pilot infrastructure for critical raw materials.
What is planned for research
Pilot science parks
The plan calls for work towards science parks in the critical raw materials sector. Its target is three parks with technology and innovation support centres.
S1Testing laboratories and pilot zones
Planned measures include an accredited laboratory network and the identification of potential pilot zone locations for technologies that contribute to net-zero emissions.
S1Recovering components from waste
The plan envisages a state key laboratory and pilot processes for recovering critical components from waste. Applying this measure to a particular formation-brine project requires a separate justification.
S1The strategy sets a direction; it does not replace the special permit or other decisions required for an individual project.
A legal foundation exists. The full cycle needs alignment
Ukrainian rules already address industrial groundwater and the recovery of useful components. DLE needs a coherent pathway connecting resource rights, research, lithium extraction, water management and impact monitoring.
Resource and components
The instruction on industrial groundwater explicitly covers recoverable components, including lithium. It provides a basis for classifying the reserves and resources of these deposits.
S3Connect water composition testing, component reserve assessment and the granting of rights into a consistent pathway for each DLE project.
Spatial rights
The Subsoil Code governs the use and spatial boundaries of a subsoil area and the relationship between permits. Groundwater documentation also accounts for abstraction facilities.
S2S4Align the DLE area’s horizontal and depth boundaries, abstraction and reinjection intervals, boundary revisions, and their treatment in auction and permit documents.
Water and reinjection
Article 48 of the Water Code excludes the use of groundwater to extract useful components from special water use. Other water operations are assessed separately. Article 75 addresses the return of associated formation water from oil and gas fields; its application to brine after DLE requires a separate legal assessment.
S5Define the receiving interval, technological project, water composition and volume requirements, monitoring, and water management arrangements if reinjection stops.
Infrastructure and other operators
Subsoil use rights do not replace rights to land, wells or equipment. Access to infrastructure requires its own legal arrangements.
S2Establish compatible operating conditions for the DLE operator and existing subsoil user, contractual infrastructure access, data exchange and clear responsibilities.
A laboratory sample test, a field pilot involving abstraction and reinjection, and industrial operations are different activities. Environmental impact assessment and other requirements depend on the nature and scale of the specific works. S10
Developing proposals for the full DLE cycle
DLE Field System is working to improve the legal conditions for direct lithium extraction from subsurface brines. We are developing proposals with Ukraine’s professional community to align resource rights, the technological cycle and safety requirements. Our aim is a predictable foundation for research, investment and responsible industrial development.
Proposals prepared · Professional review
From research to production
Align geological exploration, trial production, component assessment and the transition to commercial extraction.
Spatially defined rights
Define the boundaries, area and depths of a technically justified part of the formation, abstraction and reinjection intervals, and a process for revising boundaries.
Access and compatible operations
Establish clear auction conditions, respect existing rights and provide contractual arrangements with infrastructure owners.
Reinjection of treated water
Align rights to the receiving interval, the technological project and reinjection requirements. Treated water must be assessed for compatibility with the specific formation.
Monitoring and accountability
Define how abstraction, extracted components and reinjection are measured, how water and wells are monitored, and when operations must stop or water management must change.
Using existing infrastructure
Define conditions for reusing oil and gas wells following inspection, integrity assessment and confirmation of technical suitability.
Transparent resource payments
Align the measurement of water, extracted components and saleable product with the applicable fiscal rules.
Areas of work: the Subsoil Code, Water Code, related procedures and secondary legislation; the Tax Code is being considered separately.
Our proposed framework
The DLE legal iceberg
Resource rights are the starting point. The full cycle also needs rules for water reinjection, safety and accountability.

- 01
Special permit
Who may use which resource, and for which operations.
- 02
Spatial boundaries
Horizontal boundaries, area, depth intervals, and abstraction and reinjection zones.
- 03
Water and lithium extraction
Lawful water supply, rights to extract dissolved components, and accounting for reagents and residues.
- 04
Operator coexistence
Compatible operating conditions, data exchange and rights to use wells.
- 05
Reinjection authorisation
Rights to the receiving interval and a technological project before operations begin.
- 06
Reinjection safety
Water composition, formation suitability, well integrity, pressure, volumes and protection of fresh groundwater.
- 07
Monitoring and accountability
Monitoring, suspension when unsafe, and lawful water management if reinjection stops.
Changes in the legal and industrial landscape
Parliamentary committees review changes to Ukraine’s subsoil-use mechanisms
Bill No. 15454 concerns granting and exercising subsoil-use rights through electronic auctions and production-sharing agreements. The lead committee recommended a first-reading adoption on 24 September; the digital transformation committee submitted observations on 6 October. As of 16 October, the bill awaits consideration.
Ukraine adopts its Circular Economy Development Strategy
Order No. 934-r sets the direction for circular economy development through 2035 and approves an operational plan for 2026–2028. It provides context for resource projects focused on efficient material use and secondary raw materials.
Ukraine’s Ministry of Economy presents its critical raw materials White Paper
The publication examines investment projects, geological data, domestic processing and permitting. For DLE, it provides wider context for moving from resource potential to practical project conditions. The White Paper is an analytical document, not legislation.
From priority to practical conditions
National agenda
- 27 May 2026
Strategy to 2056
AdoptedThe Government endorsed the Strategy and approved the operational plan for 2026–2028.
S1 - 2026–2028
Research, laboratories and pilot technologies
PlannedThe national plan sets out measures to develop research infrastructure. Progress must be established through implementation reports.
S1 - 1 March 2027
First annual report
Reporting deadlineThe first annual report on implementation of the Strategy is due to the Government by 1 March 2027 and is to be published by the Ministry of Economy.
S1 - 16 October 2026
Subsoil use bills
Awaiting considerationAs of 16 October 2026, Bill 15454 and alternative Bill 15454-1 await consideration. Committee opinions are a stage in the parliamentary process.
S8S9
DLE Field System’s work
Proposals prepared
PreparedProposals have been developed to align resource rights, the technological cycle and DLE operators’ responsibilities.
Professional review
In progressWe are working with Ukraine’s professional community on spatial rights, water reinjection, operator compatibility and oversight of the full cycle.
An agreed public proposal
Next stepThe next step is to agree a public version of the proposals and present it through the relevant professional and policy development processes.
Conditions for implementation
Subject to required decisionsProgression to field and commercial operations depends on the necessary decisions, studies, resource rights and project approvals.
Official documents
- S1Adopted strategy and plan
Strategy for developing industries based on minerals and components of strategic and critical importance to 2056
Cabinet of Ministers of Ukraine · · №569-р
Lithium section; operational plan: task 6, measures 2–4, task 14, measure 3; paragraph 4 of the order
- S2Existing rule / document
Subsoil Code of Ukraine
Verkhovna Rada of Ukraine · · №132/94-ВР
Articles 16, 16⁵ and 18–19
- S3Existing rule / document
Instruction on applying the mineral reserves and resources classification to industrial groundwater deposits
State Commission of Ukraine on Mineral Resources · · №393; 981/16997
Section 4.1: recoverable components, including lithium
- S4Existing rule / document
Amendments to model agreements on subsoil use conditions
Ministry of Economy · · №3053
Model agreements and groundwater documentation
- S5Existing rule / document
Water Code of Ukraine
Verkhovna Rada of Ukraine · · №213/95-ВР
Articles 48–49; Article 75 — associated formation water from oil and gas fields
- S6Official analysis
White Paper on developing Ukraine’s critical raw materials sector
Ministry of Economy · · White Paper 2026
Official announcement and analytical publication
- S7Adopted strategy and plan
Strategy for developing Ukraine’s circular economy to 2035
Cabinet of Ministers of Ukraine · · №934-р
Strategy and operational plan for 2026–2028
- S8Bill · awaiting consideration
Bill on granting and exercising subsoil use rights through auctions and production sharing agreements
Verkhovna Rada of Ukraine · · №15454
Bill record and committee opinions; awaiting consideration as of 16 October 2026
- S9Bill · awaiting consideration
Alternative bill on mechanisms for granting and exercising subsoil use rights
Verkhovna Rada of Ukraine · · №15454-1
Bill record and committee opinions; awaiting consideration as of 16 October 2026
- S10Existing rule / document
Law of Ukraine on Environmental Impact Assessment
Verkhovna Rada of Ukraine · · №2059-VIII
Article 3: scope of environmental impact assessment
DLE FIELD SYSTEM
Join the professional dialogue
Working in subsoil use, hydrogeology, extraction technologies or regulatory policy? Let’s discuss specific questions across the full DLE cycle.