NOA completes 48-hour pumping test at Rio Grande
NOA Lithium Brines reports completion of well RT-RG26-PW001 and a 48-hour continuous pumping test at Rio Grande, Argentina, with a stable hydraulic response. Drilling-fluid losses limited depth to 140 metres versus the planned 400 metres. Brine chemistry results remain pending, and this test did not assess aquifers below 140 metres.
- Source date
- 05 Nov 2026 · P2
