01 / Context
About the event
Lithium track on 8–9 December: brine extraction, sorbents and product purification.
- Sorbents
- Purification
- Process engineering
02 / The DLE perspective
Why it matters for DLE
Lithium recovery and production at the required purity need to work as one process. The lithium track examines sorbents, purification and the engineering that connects these stages.
Sources and programme
Checked on 17 October 2026